Cambridge South

CASE STUDY

Overview

Cambridge South is a new two storey, four platform station that will be constructed on the West Anglia Main. The Programme is in the detailed design & build stage.

Client Requirement

A Engineering have been engaged by NR to provide engineering leadership and specialist project engineering support.
 
The remit also includes support to close out legacy projects in the region.

Our Solution

The EFA team lead all integration activities and provide discipline specific expertise. We liaise with various design organisations and the build contractor, coordinating the reviews required to ensure that the delivery programme is met.

We also provide engineering leadership in the close out of legacy projects.

Our Services

EFA are supporting the programme with the following resources:

Designated Project Engineer (Cambridge South)

Designated Project Engineer x2 (Historic hand-back)

Project Engineer Track

Project Engineer Signalling

Project Engineer Civils

Project Engineer Fire