Crossrail West – Feasibility Study

Key Facts

Network Rail appointed EFA Engineering to carry out a comprehensive feasibility study for the closeout and handover of 34 historic Crossrail West projects on the Elizabeth Line, spanning from Paddington to Reading. 

 

The review identified a series of common legacy issues, including missing as-built drawings, incomplete Asset Management Plan (AMP) forms, and unresolved hazards and requirements. EFA Engineering undertook a detailed analysis of hundreds of documents, drawings, reports, and certificates to assess the effort and cost needed to produce Health & Safety Files and final submissions to Network Rail. 

 

By applying a Minimum Viable Product (MVP) approach, the team optimised delivery, significantly reducing time and cost while ensuring full compliance. 

 

Services

Project Management 

Engineering Management (PEM & DPE) 

BIM/CAD 

Hazard Log Management 

Health & Safety Files Management 

Asset Management Plan (AMP) 

Commercial Management 

Requirements Management 

Call off PE resources (all disciplines) 

Location

Paddington to Reading

Client

Network Rail

Year

2022

Sector

Railway Mainline

Category
All Studies, Studies 2